Acetylene Cylinder Filling Plant
We are world class manufacturer and exporter of acetylene gas plant for oxy acetylene gas welding and cutting applications. Automatic standard acetylene generation plant is used for producing ac..
The process for producing acetylene gas involves a chemical reaction between calcium carbide and water. Raw materials used in the reaction are water and calcium carbide, which is popular for commercial production of acetylene. CaC2 (chemical formula for calcium carbide) is made by a mixture of line and coke in a blast furnace. The reaction between water and Cac2 is formulated as CaC2 + 2H2O -> C2H2 + Ca(OH)2 The reaction generates C2H2 (acetylene), calcium hydroxide and heat. Very less moisture content is generated during the reaction.
The process for generation of acetylene gas is described in detail below. We use the standard size of calcium carbide during the testing of acetylene gas plants. However, you can use the CaC2 of varying sizes which will have impact on the performance.
Acetylene is one of the most popular fuel gases, which is used in wide range industrial applications. It is used in combination with oxygen for generating high flame temperatures. Some of the industrial applications are given below:
S.NO | Description | UA-15 | UA-25 | UA-50 | UA-100 | UA-200 | |
1. | Capacity Cubic Meter per hour | 16 | 27.5 | 55 | 110 | 220 | |
2. | RAW MATERIAL REQUIRED | ||||||
Raw Material | Calcium Carbide (kg/m3 of gas) Main Raw Material -cac2- Carbide quality 5mm to 25 mm specify | 3.3 | 3.3 | 3.3 | 3.3 | 3.3 | |
Power | Power (average requirement) | 10kw | 12kw | 15kw | 28kw | 40kw | |
Water | Cooling water make-up (liters/N.cubic meter of gas) | 10 | 10 | 10 | 10 | 10 | |
3. | CHEMICAL & CONSUMABLES IN SMALLER QUANTITIES FOR PURIFYING PROCESS | ||||||
Calcium Chloride (gms/N.cubic meter of gas) (one charge supplied inside LP drier) | 50 | 50 | 50 | 50 | 50 | ||
Purifying mass (gas plus acid absorbtion mix per cum of gas) | 15gms/N.Cum+4gms | 15gms/N.Cum+4gms | 15gms/N.Cum+4gms | 15gms/N.Cum+4gms | 15gms/N.Cum+4gms | ||
4. | CYLINDER FILLING | ||||||
Acetone in cylinders pumped through acetone pump | As Required | As Required | As Required | As Required | As Required | ||
Space Required (approx.) | As Required | As Required | As Required | As Required | As Required | ||
Process Area | 50 Sq.M | 70 Sq.M | 110 Sq.M | 150 Sq.M | 200 Sq.M | ||
Carbide Area | 60 Sq.M | 75 Sq.M | 112 Sq.M | 175 Sq.M | 250 Sq.M | ||
Cylinder Filling Area | 30 Sq.M | 40 Sq.M | 60 Sq.M | 100 Sq.M | 150 Sq.M | ||
Cylinder Storage Area (Depending upon cylinder inventory) | 80 Sq.M | 100 Sq.M | 160 Sq.M | 200 Sq.M | 400 Sq.M | ||
Lime Slurry disposal area | 80 Sq.M | 100 Sq.M | 180 Sq.M | 250 Sq.M | 300 Sq.M | ||
Free Space around the plant (on all sides) | 15 M | 16 M | 18.5 M | 20 M | 20 M | ||
Acetone Godown | 10 Sq.M | 12 Sq.M | 20 Sq.M | 30 Sq.M | 40 Sq.M |